Guides / ETA
WPC ETA: how it works
How Equipment Type Approval from the WPC Wing (often called a WPC certificate) is obtained for wireless equipment, taken from the Department of Telecommunications' own pages.
Wireless Planning and Coordination Wing (WPC), Department of Telecommunications. Sources last reviewed .
Key facts
Undated source: WPC's ETA FAQ says an ETA has no period restriction and needs no renewal. The FAQ carries no date, so check any expiry shown on your own approval.
“There is no period restriction for ETA and no further renewal is applicable.”
Source: WPC, ETA frequently asked questions on SARAL Sanchar (undated), question 9. Checked .
Check the route. Since 9 September 2024, ETA for equipment in licence-exempt bands is granted on self-declaration.
“shall be granted to the applicant on a self-declaration basis.”
Source: DoT WPC Wing, Office Memorandum R-11017/01/2018-PP(part-1), 9 September 2024. Checked .
Pay the fee, which the department's page gives as ₹10,000.
Source: Department of Telecommunications eServices, Equipment Type Approval. Checked .
What it is
ETA is issued by the Wireless Planning and Coordination Wing of the Department of Telecommunications, for equipment that transmits on radio frequencies.
Source: Department of Telecommunications eServices, Equipment Type Approval. Checked .
The department's page names mobile handsets, smartphones, tablets, laptops, smart watches, short range devices, microphones, speakers, headphones, earphones, printers, scanners and cameras that operate in licence-exempt bands.
Source: Department of Telecommunications eServices, Equipment Type Approval. Checked .
The licence-exempt bands are set by separate gazette rules, listed in the National Frequency Allocation Plan 2025. They include 2.4 to 2.4835 GHz (GSR 45(E), 28 January 2005) and the 5 GHz ranges 5150 to 5250, 5250 to 5350, 5470 to 5725 and 5725 to 5875 MHz (GSR 1048(E), 18 October 2018).
Source: National Frequency Allocation Plan 2025, Chapter 4, Annexure-1. Checked .
Who applies
The applicant applies on the SARAL Sanchar portal. For equipment made abroad, the Indian representative holds the manufacturer's authorisation, and a self-declaration from the importer or that representative is what Customs accepts.
Source: Department of Telecommunications eServices, Equipment Type Approval. Checked .
How to get it
Check the route. Since 9 September 2024, ETA for equipment in licence-exempt bands is granted on self-declaration.
“shall be granted to the applicant on a self-declaration basis.”
Source: DoT WPC Wing, Office Memorandum R-11017/01/2018-PP(part-1), 9 September 2024. Checked .
Four kinds of equipment cannot use self-declaration: radar, jamming devices, drones and satellite equipment.
Source: Department of Telecommunications eServices, Equipment Type Approval. Checked .
Partly published: Submit on SARAL Sanchar with the documents. The department's page lists three: an RF test report, the manufacturer's authorisation for the Indian representative, and technical literature.
Source: Department of Telecommunications eServices, Equipment Type Approval. Checked .
Pay the fee, which the department's page gives as ₹10,000.
Source: Department of Telecommunications eServices, Equipment Type Approval. Checked .
On successful submission, download the ETA from the portal.
Source: DoT WPC Wing, Office Memorandum R-11017/01/2018-PP(part-1), 9 September 2024. Checked .
Does a WPC ETA expire?
Undated source: WPC's ETA FAQ says an ETA has no period restriction and needs no renewal. The FAQ carries no date, so check any expiry shown on your own approval.
“There is no period restriction for ETA and no further renewal is applicable.”
Source: WPC, ETA frequently asked questions on SARAL Sanchar (undated), question 9. Checked .
An ETA covers radio-frequency requirements only. The 2024 memorandum says a holder must still obtain a DGFT NOC or other clearances before importing.
Source: DoT WPC Wing, Office Memorandum R-11017/01/2018-PP(part-1), 9 September 2024. Checked .
Not yet confirmed
What the published sources do not settle. Nothing here is filled in with a guess.
Partly published: The full set of documents SARAL Sanchar asks for. The three above are a summary on a service page, and the upload set is likely longer.
Source: Department of Telecommunications eServices, Equipment Type Approval. Checked .
Not published: The exemption rule for the 6 GHz band. It is not in NFAP 2025's list, so for a model that uses Wi-Fi 6E or Wi-Fi 7, find that rule directly.
No published source found. Searched .
Not published: How ETA and MTCTE relate for a model that needs both. No published source says whether one presupposes, replaces or runs independently of the other.
No published source found. Searched .
Why it matters
The department's own description of what ETA is required for:
“It is required for the import, sale, and use of wireless communication devices that operate in de-licensed frequency bands or involve radio frequency (RF) transmission.”
Source: Department of Telecommunications eServices, Equipment Type Approval. Checked .
How SchemeClock helps
- Track ETA beside CRS and MTCTE for the same model, stage by stage, with the day each stage happened.
- Record the grant with its reference number. The expiry date is optional for ETA: leave it blank if the approval shows none, and no reminders are sent.
- If your approval does show an expiry date, enter it, and the reminders go out 180, 90, 30 and 7 days before it.
- Already keep a spreadsheet? Import it; an ETA row needs no expiry.
- Consultants: one login holds each client as its own organisation.
- It files nothing. Submission stays on SARAL Sanchar, in your hands.
A summary of the authorities’ published sources as checked on . Not legal advice: the authority’s official notification always wins. Spotted something out of date? Tell us.